Builder Portal How-To

How to Add Your RERA Number to a Project on DrawMagic

A step-by-step walkthrough for developers on entering a project's RERA registration number on DrawMagic so buyers see it correctly and can verify it on the state portal.

DrawMagic Team6 Nov 202612 min read

A missing RERA number on a project promotion is not a small omission. Under the Real Estate (Regulation and Development) Act, 2016, every advertisement, brochure, and listing for a registered project is required to carry its RERA registration number. If your project appears on DrawMagic without one, you are not just leaving a gap in your listing — you are publishing a promotion that does not meet the disclosure standard buyers now expect as default. Serious buyers in every major market have learned to scan for that number before they call, message, or shortlist. Its absence reads less like an oversight and more like a reason to move on to the next listing.

The good news is that adding your RERA number to a DrawMagic project takes a few minutes once you know where the field lives and what format your state authority expects. This guide walks through exactly that: where to enter the number, how it appears to buyers, the state-by-state formats you need to get right, and the mistakes that quietly undermine an otherwise strong listing. It also draws a clear line around what DrawMagic does and does not do with that number — because getting that distinction right matters as much as entering the digits correctly.

RERA, 2016 was built around a simple idea: buyers should not have to take a developer's word for a project's legal standing. Every state has set up its own regulatory authority — MahaRERA in Maharashtra, K-RERA in Karnataka, TG-RERA in Telangana, TNRERA in Tamil Nadu, HARERA in Haryana, UP-RERA in Uttar Pradesh, and equivalents elsewhere — and each authority issues a unique registration number per project once the developer has filed the required disclosures: land title, approved layout, promised amenities, and a committed possession timeline.

The Act's advertising provisions require that number to appear on every medium used to promote the project — hoardings, brochures, newspaper ads, and, by extension, online listings. This is not a DrawMagic-specific rule. It is a statutory obligation that exists whether or not the project is listed on any particular platform. What DrawMagic gives you is a dedicated, structured field to comply with it correctly, alongside the rest of your project details, rather than leaving the number to be typed inconsistently into a free-text description where it is easy to omit, mistype, or bury.

As India's real estate sector has formalised over the past decade, that formalisation is exactly the kind of shift RERA compliance signals. According to IBEF's Real Estate Industry in India report (February 2026), the sector is on a trajectory from roughly US$200 billion in 2021 toward US$1 trillion by 2030, a scale-up that has pulled in more institutional capital and more scrutiny of documentation at every stage. In a market moving in that direction, a correctly displayed RERA number is table stakes, not a differentiator — but its absence is increasingly conspicuous.

Step-by-Step: Adding Your RERA Number on DrawMagic

Here is the exact path to enter or update a project's RERA registration number.

  1. Sign in and open your workspace. From /builder/dashboard, navigate to your list of projects.
  2. Open the project record. Select the specific project you want to update — RERA numbers are entered per project, not per company, since a single developer entity may run several registered projects simultaneously.
  3. Locate the RERA registration field. If you are creating a new listing from scratch, this field appears in the compliance/legal section of the new project form, alongside possession date, approved layout details, and land title information.
  4. Enter the number exactly as issued. Copy it character-for-character from your state authority's registration certificate or portal record — do not retype from memory, and do not abbreviate or reformat it.
  5. Save the draft. Confirm the field has saved before moving to other sections.
  6. Review and publish. Once the rest of the listing is complete, publish the project. The RERA number now displays on the buyer-facing listing.
  7. Manage it going forward. For any project already live, open /builder/listings to find the project and edit the RERA field directly if the number needs a correction or if a project moves to a new registration phase.

The field is intentionally simple — a single structured entry — because the goal is accuracy, not decoration. A RERA number is not a marketing element to be styled; it is a fact that needs to be exactly right.

State RERA Authorities: Where Numbers Come From and Where Buyers Check Them

Each state authority issues numbers in its own format and hosts its own public verification portal. Getting the state right matters as much as getting the digits right — a Maharashtra project should never carry a Karnataka-format number, and buyers checking a mismatched format will notice immediately.

StateAuthorityTypical Format PatternWhere Buyers Verify Independently
MaharashtraMahaRERAP + region code + digits (e.g., P519xxxxxxxx)MahaRERA's official portal
KarnatakaK-RERA (RERA Karnataka)PRM/KA/[district]/[project-type]/[digits]/[year]K-RERA's official portal
TelanganaTG-RERAP02[digits]TG-RERA's official portal
Tamil NaduTNRERATN/[digits]/[year]TNRERA's official portal
HaryanaHARERA (Gurugram/Panchkula)RC/REP/HARERA/GGM/[digits]/[year]HARERA's official portal
Uttar PradeshUP-RERAUPRERAPRJ[digits]UP-RERA's official portal

This table is a starting orientation, not an exhaustive legal reference — always confirm the exact current format and verification URL for your specific state, since formats and portal structures are set and occasionally revised by each state authority independently.

Under-Construction vs. Completed Projects: Registration Nuances

RERA registration requirements differ slightly depending on where a project sits in its lifecycle:

  • Under-construction projects are the core case RERA was built around. Registration is mandatory before any advertising, marketing, booking, or sale of units, and the number must be displayed from the very first promotional material — including the first version of a DrawMagic listing.
  • Completed projects with a valid occupancy certificate are generally exempt from RERA registration requirements for future sales, since the regulatory intent (protecting buyers against construction-stage risk) no longer applies in the same way. If you are listing a fully completed, OC-received project, you may not have a RERA number to enter — and that itself is a fact worth stating plainly in your listing rather than leaving the field blank without context.
  • Phased projects — common in large Indian townships and layouts — often carry a distinct RERA number per phase or tower, since each phase may be registered separately as it moves toward launch. Keep the number attached to the correct phase-level listing rather than reusing one number across multiple phases.

A Gurugram Developer's Walkthrough

Consider a mid-sized developer launching a residential tower in Sector 82, Gurugram. The project has just received its HARERA registration certificate, issued in the RC/REP/HARERA/GGM/[digits]/[year] format specific to the Gurugram bench of Haryana's authority. Before publishing the DrawMagic listing, the team's compliance lead pulls up the registration certificate PDF, copies the number character-for-character into the RERA field on the new project form, and cross-checks it once against the certificate before saving.

They also note the project's possession date as stated in the RERA filing and make sure the same date appears in the project's possession-timeline field — a small but important consistency check, since a mismatch between the RERA-filed date and the marketed date is exactly the kind of discrepancy an attentive buyer, or the authority itself, might flag. Once the listing is complete, they preview it, confirm the number displays correctly on the buyer-facing view, and publish.

How the Number Appears to Buyers — and How They Verify It Themselves

Once published, the RERA number appears on the project's public listing page as a discrete, labelled fact — not styled as a badge, seal, or endorsement. DrawMagic displays exactly the number the developer has entered; it does not independently confirm the number against the state authority's database, and it does not certify, score, or vouch for the project's regulatory standing in any way.

That distinction matters for two reasons. First, it is an honest description of what the platform does: display information the developer is required to disclose. Second, it points buyers toward the right next step — checking the number themselves on the relevant state RERA authority's public portal, where they can see the project's filed details, promised timeline, and any regulatory actions on record. A buyer who does this is not distrusting your listing; they are doing exactly what RERA was designed to make possible; a system of self-checkable disclosure rather than blind trust in a developer's claims.

Pro Tips for Getting the RERA Field Right

  • Enter the number exactly as issued — including hyphens, slashes, and letter casing. State portals often reject or fail to match numbers that have been retyped with even small formatting differences.
  • Keep phase-specific numbers distinct. If your project has multiple registered phases, make sure each DrawMagic listing (or listing section, if phases are grouped) carries the correct phase-specific number rather than a single blanket number.
  • Update on re-registration. If a project's registration lapses and is renewed, or if a phase transitions to a new registration, update the field promptly rather than leaving the old number live.
  • Cross-check possession dates. Whenever you touch the RERA field, glance at the possession date filed with the authority and confirm your listing's timeline still matches it.
  • Keep the certificate on file. Store the original registration certificate alongside your project records so you can quickly verify the number if a buyer or team member ever questions it.

Common Mistakes to Avoid

  • Omitting the number entirely on the assumption that it is optional or can be added "later" — this leaves a live, non-compliant promotion visible to buyers in the meantime.
  • Typos from manual retyping, especially transposed digits or missed hyphens, which make the number unmatchable against the authority's actual record.
  • Entering a company or firm registration number instead of the project-specific RERA number — these are different identifiers, and buyers checking the wrong one will find nothing or a mismatch.
  • Reusing one number across multiple distinct phases of a multi-phase project, which creates confusion about which phase a buyer is actually evaluating.

Complete the Rest of the Listing Around It

A correct RERA number does more work when it sits inside a complete, accurate listing. Use /builder/projects/new to fill in floor plans, configuration-wise carpet areas, amenities, and photos alongside the compliance fields, and manage everything — including RERA numbers, pricing, and availability — for all your live projects from /builder/listings as details evolve.

A Note on What DrawMagic Does and Does Not Certify

DrawMagic is an information and software platform. It is not a broker, an agent, a financial or legal advisor, or a payment or escrow intermediary — and it does not certify, verify, or guarantee the RERA status, legal standing, or outcomes of any listed project. The RERA number shown on a listing is information the developer has entered; buyers are encouraged to confirm it independently on the relevant state RERA authority's official portal before making any commitment. This framing protects everyone: it keeps your listing factually accurate, and it keeps buyer trust anchored in a verifiable public record rather than a platform claim.

Key Takeaways

  • The RERA Act, 2016 requires the registration number on every promotion of a registered project, including online listings — this is a statutory obligation, not a platform preference.
  • On DrawMagic, the RERA number is entered as a dedicated field on the project form, accessible from /builder/projects/new and editable later via /builder/listings.
  • Enter the number exactly as issued on your state authority's certificate — no retyping from memory, no reformatting.
  • State formats differ: MahaRERA, K-RERA, TG-RERA, TNRERA, HARERA, and UP-RERA each use distinct numbering conventions.
  • Completed, OC-received projects may legitimately have no RERA number for future sales — state this clearly rather than leaving the field ambiguously blank.
  • Multi-phase projects typically need distinct RERA numbers per phase; do not reuse one number across phases.
  • DrawMagic displays the number the developer provides — it does not verify or certify it against the state database.
  • Buyers are expected, and encouraged, to independently confirm the number on the relevant state RERA portal.
  • Keep possession dates in your listing consistent with what was filed with the authority.
  • Manage your project's compliance details from /builder/dashboard, and explore the full developer offering at DrawMagic for builders.

FAQ

Does DrawMagic verify my RERA number against the state database? No. DrawMagic displays the RERA number exactly as you enter it. It does not independently verify it, and buyers are encouraged to confirm it on the relevant state RERA authority's public portal.

What if my project is fully completed and has no active RERA number? Completed projects with an occupancy certificate are generally exempt from RERA registration requirements for future sales. State this fact plainly in your listing rather than leaving the RERA field blank without explanation.

Can I update the RERA number after the listing is live? Yes. Open the project from /builder/listings and edit the RERA field directly if a correction is needed or the project moves into a new registration phase.

Share this article

Enjoyed this read? Join our YouTube channel for continuous discovery.

Subscribe on YouTube

Related Articles

Ready to visualise your dream home?

Use AI to generate floor plans, transform rooms, and explore interior designs — no renovation needed.